Page Header

Contact Link

phone email location icons on the contact button for Eugene Foley Construction LimtiedCONTACT US

Social Links

linkedin facebook googleplus
The works for this project comprised of the following: Predominantly of an extension to the existing flour processing plant, the original of which was constructed by Eugene Foley Construction Ltd. in 2005/06. This building was constructed of steel, concrete and metal cladding over a ground floor with a mezzanine level. Minor external drainage connections were required. The internal fit our works included some minor demolition works but mainly construction of new internal partitions, ceilings, floor finishes, M&E etc. Work carried out by Eugene Foley Construction Limited.
Steel frame in the process of being erected on an industrial building.
Industrial & Commercial Buildings Warehousing, manufacturing plants and agricultural buildings all require an efficient construction technique that not only ensures a swift completion of the project, but also that they can withstand the heavy use and workloads they will be subject to during their lifespan.

The team at Eugene Foley Construction have the experience and knowledge that you can trust, ensuring that your building is robust and durable while being finished to an aesthetically pleasing finish.
We only use quality building materials on the industrial and commercial properties we construct, combined with our attention to detail and experienced staff it means that our buildings will be finished promptly, on schedule and will have reduced ongoing repair and maintenance costs. This is due to the advanced construction techniques, long lasting concrete slab floors and optimized thermal performance that all come as standard as part of selecting the team at Eugene Foley Construction for your build. The site consists of an existing occupied fire station. The project consisted of the following:	The demolition of existing blockwork, and construction of new extension to rear of existing fire station, to include all site works. 	The existing Fire Station was occupied by staff that were retained and will be attending emergency calls as alerted.	Re-position existing gate and bollard to the rear of the extension making good all hard standings as work proceeded. All existing services were maintained throughout the construction project.
Insulated, reinforced concrete floor being layed in an industrial build.
The Maintenance Building is located within the main grounds of St. Luke’s Hospital, Kilkenny. The works for this project will comprise of the following: 	Predominantly of internal fit out works within the existing Maintenance Building. 	This building has been constructed previously and is constructed of steel, concrete and metal cladding over two floors. 	Minor external drainage connections will be required. The internal fit our works will include some minor demolition works but mainly construction of new internal partitions, ceilings, floor finishes, etc. Work carried out by Eugene Foley Construction Limited.
Steel stairs giving access to mezzanine level inside a newly built commercial property.
If you are extending an existing commercial property or a planning to build a new industrial building and would like us to submit a tender for the project, then get in contact to arrange a meeting where we can start putting together a cost effective programme of works that will be completed to the exceptionally high standards of Eugene Foley Construction Limited in Kilkenny.

Back to top